PuT interlining matrix procedure
The procedure PuT interlining matrix calculates transport system specific skim matrices for interlining trips between the stop points of a transport system. For each stop point relation generated between two stop points, the specific value calculated for the shortest path between the stop points is returned for the indicator selected. Relations are created for the selected type of pairs: between two stop points, between two active stop points or only between the stop points, which are start or end stop point of a vehicle journey of the transport system. Optionally, system routes can be considered. In this case, the indicator values for a relation are determined from the best system route, which leads directly from the start stop point to the destination stop point and which is permissible for the transport system. Transitive search via the system routes is not carried out. For each relation it is thus possible, to individually overwrite the O-D value, determined from the network.
In the line blocking procedure (Using Visum: Executing the PuT line blocking procedure), the interlining matrix is used to determine the duration and length for each empty trip between stop points. The PuT interlining matrix procedure is also provided as a separate procedure, so that the output matrices can be imported in external timetable or crew scheduling systems, as interlining matrices for line blocking.
Table 232 shows an example of a PuT interlining matrix, where the values of the shortest path (determined on the basis of the attribute t-PuTSys) between all relations between two stop points are listed. If in a cell the value is 999999, this means, that there is no path between the two stop points.
|
SP20 |
SP21 |
SP22 |
SP24 |
SP50 |
SP56 |
SP71 |
SP74 |
SP86 |
SP20 |
0 |
16 |
36 |
61 |
34 |
73 |
121 |
108 |
999999 |
SP21 |
16 |
0 |
20 |
45 |
50 |
89 |
137 |
124 |
999999 |
SP22 |
36 |
20 |
0 |
25 |
70 |
109 |
157 |
144 |
999999 |
SP24 |
61 |
45 |
25 |
0 |
95 |
134 |
182 |
169 |
999999 |
SP50 |
34 |
50 |
70 |
95 |
0 |
39 |
87 |
74 |
999999 |
SP56 |
73 |
89 |
109 |
134 |
39 |
0 |
48 |
35 |
999999 |
SP71 |
999999 |
999999 |
999999 |
999999 |
999999 |
999999 |
0 |
999999 |
999999 |
SP74 |
108 |
124 |
144 |
169 |
74 |
35 |
13 |
0 |
999999 |
SP86 |
121 |
137 |
157 |
182 |
87 |
48 |
999999 |
13 |
0 |
Table 232: PuT interlining matrix with t-PuTSys between stop points